Overview
The Wisconsin Department of Transportation (WisDOT) will improve a 1.2-mile section of WIS 81 between WIS 23 and Wildcat Rd. The current pavement is deteriorating and has extensive cracking and rutting.
- Construction schedule: April 14 - mid-June 2025
The Wisconsin Department of Transportation (WisDOT) will improve a 1.2-mile section of WIS 81 between WIS 23 and Wildcat Rd. The current pavement is deteriorating and has extensive cracking and rutting.
- Construction schedule: April 14 - mid-June 2025