Project Overview
This is a Highway Safety Improvement Project to address traffic safety and operations along 0.6 miles of WIS 80 in Necedah. The project is designed to widen the east side of the roadway to construct left-turn lanes.
Proposed Improvements:
- Pavement resurfacing (remove top 2 inches then replace with 2 inches of asphalt pavement)
- Widen roadway to the east
- Create 10 foot left turn lane/painted gore with left turn lanes at the North entrance of St. Francis of Assisi Catholic Church, the North entrance of the Necedah Middle/High School, and Kingsbury Drive