WIS 76 - Outagamie County

Reconstruction

Project Overview

WIS 76 location mapThe Wisconsin Department of Transportation will reconstruct approximately 1.5 miles of roadway through the village of Greenville and town of Ellington beginning March 9, 2026.

NOTICE OF PUBLIC MEETING

A WIS 76 public construction information meeting will be held at 5 p.m., Wednesday, June 3, 2026, at the Greenville Village Hall, Outagamie County. This meeting will focus on Stage 2 construction and traffic impacts beginning in June of 2026.

WIS 76 Construction Information Meeting

  • When: 5 p.m., Monday, June 3, 2026
  • Where: Greenville Village Hall, W6860 Parkview Dr., Greenville, WI 54942

The purpose of the meeting is to provide details on the project schedule, operations, and traffic impacts for work in the WIS 76/County JJ intersection. WisDOT representatives will be available to answer questions and address concerns following a brief presentation.

Current traffic impacts: 

WIS 76 between Everglade Road and County JJ is closed to traffic for roadway reconstruction, with detours in place, until November 2026. A second detour will follow the first detour after Stage 1 work.

  • Current: Stage 1 detour
    • Stage 1 detour for WIS 76 Everglade Road to County JJ reconstruction:
      • Detour via WIS 15 to County JJ to WIS 76.
    • June 8, 2026, to November 2026: June 8, Stage 2 detour will replace the Stage 1 detour.
      • Stage 2 detour for WIS 76 Everglade Road to County JJ including the County JJ intersection.
        • Detour via WIS 15 to County JJ to Oak Street to County M to County S to WIS 76.

May 4, 2026: The railroad crossing on WIS 76 south of Everglade Road will be closed for one month and is expected to open June 1, 2026.

  • Detour route: WIS 15 to County JJ to WIS 76 for this portion of road work.

Read News Release: Construction Begins March 9, 2026

Project Location
WIS 76 from Everglade Road to the County JJ intersection in the village of Greenville and town of Ellington, Outagamie County.

Project need
The purpose of the project is to improve operation, safety and accessibility along the roadway for vehicles, bicycles, and pedestrians due to development within the areas. The project will also serve to replace the deteriorating pavement structure.

Project improvements 

WisDOT will reconstruct approximately 1.5 miles of roadway through the village of Greenville and town of Ellington. Construction elements include:

  • Reconstruction of roadway from rural roadway to urban with curb and gutter
  • New roundabout at WIS 76/County JJ intersection
  • Pedestrian accommodations on WIS 76:
    • West side: 6’ terrace, 5’ sidewalk
    • East side: 6’terrace, 5’ sidewalk from Everglade to Hummock
  • Mill and pave at railroad crossing near Everglade Road.
  • Speed limit change from 45 mph to 35 mph
  • Signing and pavement marking
  • Stormwater improvements at Glen Valley Pond
  • New stormwater pond near Hillview Drive
  • New storm sewer and lighting
  • Roundabout exhibitView the WIS 76 Project Improvement exhibit (pdf)

Schedule

Construction currently scheduled to begin March 9, 2026, and finish in fall of 2026.

Traffic impacts
WIS 76 will be closed and detoured to through traffic in two stages. Access to property owners and businesses within the work zone will be maintained at all times.

First stage closure: March 9, 2026 to November 2026.

  • WIS 76 between Everglade Road to County JJ will be closed beginning March 9.
    • Detour: WIS 15 to County JJ to WIS 76.

Second stage closure: WIS 76/County JJ intersection in June 8, 2026, to November. This closure is to create the new roundabout intersection.

  • WIS 76 and County JJ intersection will close in June, and the Stage 1 detour will change to below route.
    • Detour: Detour via WIS 15 to County JJ to Oak Street to County M to County S to WIS 76.

Railroad work full closure: May 4, 2026:

  • The railroad crossing on WIS 76 south of Everglade Road will be closed for one month and is expected to open June 1, 2026.
  • Detour route: WIS 15 to County JJ to WIS 76 for this portion of road work.

Temporary business signing and business resources

Temporary business signing may be placed during the detoured portion of the project by filling out a WisDOT business signing permit. All temporary business signing needs approval via the permit before placement to ensure it is in a safe location and does not pose a visual distraction or traffic hazard. The temporary business signing permit is free. Costs associated with creating the temporary sign are the responsibility of the business. The permit is available as a fillable-form WORD document at the webpage below:

For more information regarding temporary signing, plus tips and tools for businesses impacted by highway construction, please visit WisDOT’s “In This Together” business resource website. The In This Together program is offered to business and community leaders as an idea source as they plan for road construction in their area.

Project contacts

Onsite Project Construction Lead – Please contact the construction leader with all construction-related question.

Ryan Trzinski
Phone: 920-662-9641
Email: rtrzinski@releeinc.com 

Onsite Project Field Office

The field office is located in the southwest corner of the WIS 76/WIS 15 intersection in Greenville.

  • Address: N1594 Meadow Park Drive, Greenville, WI  54942

WisDOT Project contact

Jesse Hansen, P.E., Project Manager, WisDOT, Northeast Region
944 Vanderperren Way
Green Bay, WI 54304-5344
Phone: (920) 492-5630