Skip to content
- 2.1 miles of WIS 71 will be reconstructed from WIS 27 to just east of WIS 162 in Four Corners.
- The project will correct three substandard horizontal curves that are contributing factors of the high crash rate along this segment of WIS 71.
- Lane widths will be increased to 12 feet and shoulder width will be increased to 6 feet. Both the lanes and the shoulders will be full width asphaltic surface.
- 2.1 miles of WIS 71 will be reconstructed from WIS 27 to just east of WIS 162 in Four Corners.
- The project will correct three substandard horizontal curves that are contributing factors of the high crash rate along this segment of WIS 71.
- Lane widths will be increased to 12 feet and shoulder width will be increased to 6 feet. Both the lanes and the shoulders will be full width asphaltic surface.
more…