WIS 65, North Junction of Jewell Street to US 8

 Polk and St. Croix counties

Project Overview

Construction includes:

  • Removing approximately 2 inches of asphalt from WIS 65 and overlaying it with approximately 3.75 inches of new asphalt pavement.
  • Creating a narrow, paved shoulder to improve safety.
  • Reconstructing three areas of substandard vertical curves – one between the St. Croix-Polk County line and the curve just to the north and two stretches between 28th and 38th avenues in the Polk County town of Alden – to improve safety.