Schedule and Traffic Impacts
Page last updated: July 11, 2025
Schedule: June 12 to Aug. 18, 2025
Anticipated work scheduled: Crews will:
- Remove the existing pavement through the town of Polar
- Begin grading the roadway
- Begin paving the asphalt in the town of Polar
Traffic impacts (the next 10 days):
- Traffic will be reduced to one lane during daylight hours using a flaggers through the town of Polar
- A minimum 12-foot wide travel lane will be maintained at all times.
- A posted 13-foot width restriction will only be allowed during curb and gutter and storm sewer work.