Project Overview
Construction consists of:
- Replacing the culvert carrying Otter Creek.
- Rehabilitating the bridge over the Hay River by making concrete surface repairs, replacing bridge joints and overlaying the deck with concrete.
- Repairing or replacing additional culverts along that stretch.
- Paving over the roadway where culverts are replaced.
- Replacing guardrail and pavement markings.