Overview
The Wisconsin Department of Transportation (WisDOT) plans to improve this 4.96-mile section of WIS 60 between Lowell and Hartford by replacing the existing asphalt pavement.
- Construction schedule: July 7 - late September 2025
The Wisconsin Department of Transportation (WisDOT) plans to improve this 4.96-mile section of WIS 60 between Lowell and Hartford by replacing the existing asphalt pavement.
- Construction schedule: July 7 - late September 2025