Project Overview
This project will address 15 miles of deteriorating pavement on WIS 60.
Improvements include:
- Installation of guardrail end terminals to replace existing non-standard end terminals
- Installation of permanent pavement marking
- Installation of centerline rumble strips
- Increased paved shoulder from 3 feet to 5 feet
- Installation of shoulder rumble strips
- Replacement of several culvert pipes crossing WIS 60 due to deteriorated condition