The proposed project will resurface four-inches of pavement along WIS 59 from WIS 104 to WIS 213, south of Evansville. The project will consist of replacing the box culvert spanning a feeder stream to Allen Creek, installing new guardrail, and replacing two pipes along the project.
- Construction schedule: April 29 - July 2024
The proposed project will resurface four-inches of pavement along WIS 59 from WIS 104 to WIS 213, south of Evansville. The project will consist of replacing the box culvert spanning a feeder stream to Allen Creek, installing new guardrail, and replacing two pipes along the project.