Project Overview
The Wisconsin Department of Transportation (WisDOT) will resurface WIS 58 between Lee Lake bridge and WIS 33. The 6.73-mile long project begins in the Village of Cazenovia and heads northeast to the Village of La Valle.
Proposed improvements:
- Resurface existing pavement (mill and overlay)
- Update curb ramps as needed to meet American with Disabilities Act (ADA) requirements
- Replace guardrail and install energy absorbing terminals (EATs)
- Widen paved shoulders from 1-foot to 3-foot