Project Overview
Portions of the bridge are showing signs of deterioration. To address this, WisDOT is planning to:
- Replace the deck and some girders.
- Replace the asphalt approach slabs on both sides of the bridge.
- Replace guardrail.
Portions of the bridge are showing signs of deterioration. To address this, WisDOT is planning to: