Schedule: Work is Complete
New Traffic Pattern:
- The intersection at WIS 54/73 and Wisconsin River Drive is now open to traffic but motorists will encounter some new traffic patterns.As part of the new configuration:
- Traffic on WIS 54/73 will not stop through the intersection. Motorists travelling southbound on WIS 54/73 and Wisconsin River Drive and looking to go south, must first go around the corner and make a left turn on to the southern portion of Wisconsin River Drive yielding to eastbound traffic.
- Drivers on northbound Wisconsin River Drive south of the intersection will now be required to stop before continuing northbound on WIS 54/73 and Wisconsin River Drive or when turning left on the WIS 54/73.