Schedule and Traffic Impacts
Page last updated: Oct. 3, 2025
Schedule: Sept. 8 to Oct. 24, 2025
Anticipated work scheduled: Crews will:
- Begin milling and paving the asphalt
- Restore the disturbed areas with topsoil, grass seed and erosion control material
Traffic impacts (the next 10 days):
- Work occurring within parking lanes or on sidewalks. Flagging operations as needed.
- Pedestrian detours and temporary crosswalks to move pedestrians around sidewalk work.
- Single lane closures with flaggers for milling and paving