WIS 35, Front Street (Hudson) to North End Road (North Hudson)

 St. Croix County

Project Overview

The project includes:

  • Road resurfacing, reconstruction and concrete repair.
  • Reconstruction or replacement of curb and gutter, including curb ramps.
  • Replacement of storm sewer systems.
  • Removal of median islands, realignment of left-turn lanes, installation of new traffic signals and the extension of the northbound right-turn lane, all at the Coulee Road/Buckeye Street intersection.
  • Addition of a two-way left-turn lane between Sommers Street and North End Road.
  • Resurfacing of the Lake Mallalieu Bridge.