Project Overview
Built in 1951, the three structures have reached the end of their lives. WisDOT plans to:
- Remove the existing bridges and replace them with new structures.
- Reconstruct bridge approaches.
- Replace guardrail and pavement markings.
Built in 1951, the three structures have reached the end of their lives. WisDOT plans to: