Project Overview
The Wisconsin Department of Transportation (WisDOT) will improve pavement conditions on this 5.5-mile section of WIS 35. To improve pavement conditions a pavement resurfacing will be conducted. In urban areas of the Villages of Patch Grove and Bloomington, curb ramps will be replaced to meet ADA standards.
Additional improvements include:
- Guardrail replaced as needed
- Culvert pipe improvements as needed
- Adding centerline rumble strips
- Pavement marking improvements