Project Overview
The Wisconsin Department of Transportation (WisDOT) will improve this 4.69-mile section of WIS 33 between Randolph and Fox Lake. The purpose of this project is to address the deteriorating existing pavement and deteriorated culvert pipes to extend the pavement roadway service life.
Additional Improvements include:
- Milling and removing 2 inches of the existing asphalt pavement and paving 3.5 inches of HMA pavement along WIS 33
- Milling and removing the existing 5.25 inches of HMA pavement in the WIS 33 and WIS 73 intersection and paving 5.25 inches of HMA pavement
- Replacing 12 existing culverts throughout the project limits with new concrete culverts