Project Overview
Crews will address needed structure approach grading, install a heavy rip rap berm and regrade slopes at the west abutment to the Wolf River, improve drainage, and conduct concrete pavement repairs and replacements.
Crews will address needed structure approach grading, install a heavy rip rap berm and regrade slopes at the west abutment to the Wolf River, improve drainage, and conduct concrete pavement repairs and replacements.