WIS 29, 320th Street to Koser Avenue

Chippewa and Clark counties

Project Overview

Construction includes:

  • Patching the concrete pavement
  • Placing 3.75 inches of asphalt over the existing roadway
  • Removing a portion of the existing pavement on the WIS 29 on- and off-ramps at the County H interchange in Stanley and on County H between the east- and westbound ramps and placing new asphalt pavement
  • Repairing culverts as needed
  • Rehabilitating the structure over Hay Creek east of Boyd
  • Closing and removing the intersection on WIS 29 at 320th Street per the town of Delmar’s request