Project Overview
Construction includes:
- Patching the concrete pavement
- Placing 3.75 inches of asphalt over the existing roadway
- Removing a portion of the existing pavement on the WIS 29 on- and off-ramps at the County H interchange in Stanley and on County H between the east- and westbound ramps and placing new asphalt pavement
- Repairing culverts as needed
- Rehabilitating the structure over Hay Creek east of Boyd
- Closing and removing the intersection on WIS 29 at 320th Street per the town of Delmar’s request