Project Overview
Construction includes:
- Recycling the top 3 inches of pavement on the majority of the project corridor and overlaying it with asphalt.
- Resurfacing approximately 1,000 feet of asphalt pavement just south of WIS 29.
- Repairing the Paint Creek Bridge and substructure; milling the bridge deck and applying a concrete overlay; and adding approach pavement on both sides of the structure.
- Cleaning, repairing, removing or replacing culverts as needed.
- Adding centerline rumble strips.
- Upgrading guardrail.