Project Overview
The project is located on WIS 29 between Stillson Creek (Chippewa Falls, WI) and WIS 13 (Abbotsford, WI) and includes improvements along a 50 mile stretch of roadway. Motorists will encounter single lane closures and should expect travel delays through this region.
The scheduled work includes:
- concrete pavement repairs
- asphaltic overlay of the travel lanes and shoulders (Stillson Creek to 320th Street)
- asphaltic overlay of the shoulders (320th Street to STH 13)
- median crossover upgrades
- guardrail replacements to improve safety
- replacement of signing and pavement marking.
- The interchange ramps and crossroads between the ramp terminals at County X, WIS 27, and County D are also to be repaired and resurfaced.