WIS 29 Chippewa Falls

Abbotsford

Project Overview

The project is located on WIS 29 between Stillson Creek (Chippewa Falls, WI) and WIS 13 (Abbotsford, WI) and includes improvements along a 50 mile stretch of roadway. Motorists will encounter single lane closures and should expect travel delays through this region.

The scheduled work includes:

  • concrete pavement repairs
  • asphaltic overlay of the travel lanes and shoulders (Stillson Creek to 320th Street)
  • asphaltic overlay of the shoulders (320th Street to STH 13)
  • median crossover upgrades
  • guardrail replacements to improve safety
  • replacement of signing and pavement marking.
  • The interchange ramps and crossroads between the ramp terminals at County X, WIS 27, and County D are also to be repaired and resurfaced.