Project Overview
WisDOT plans to resurface the nearly 11-mile section of WIS 26 between WIS 33 and just south of Milligan Road to improve the pavement surface.
Improvements include:
- Mill and overlay the existing asphalt pavement
- Increase the paved shoulder width from three feet to five feet with the use of Highway Safety Improvement Funding
- Replace existing guardrail near the Mill Creek and Plum Creek crossings
- Replace deteriorated roadway cross culverts
- Install centerline and shoulder rumble strips
- Railroad crossing improvements