Project Overview
This project will resurface WIS 23 between the Wisconsin River bridge and US 14 in Spring Green. Additional improvements include:
- Removing 4 inches of asphaltic pavement and replacing that with 4 inches of new asphaltic pavement
- Subgrade repairs near Madison Street
- Updating curb ramps to meet Americans with Disabilities Act standards
- Replacing a railroad crossing surface
- Replacing end walls on a culvert north of Old River Road
- Installing safety rumble strips on the 55-mph section of the highway