Overview Schedule/Traffic impacts Map Photo gallery (current) Sign Up for Updates (current) Contact us (current) Photo gallery April 5, 2017 Crews begin work on underground utilities. April 13, 2017 Pavement removal May 3, 2017 Sanitary sewer construction between 14th Street and 15th Street. May 3, 2017 Sanitary sewer construction at 15th Street. May 10, 2017 Sanitary sewer connection May 10, 2017 Sanitary sewer excavation May 17, 2017 Storm sewer installation May 24, 2017 Storm sewer installation between 15th Street and Harriet Street June 21, 2017 Crews grading from Harriet Street to 17th Street. June 21, 2017 Crews working on the under drain at the 15th Street intersection. July 5, 2017 Storm sewer installation at the north end of the project. July 12, 2017 Storm sewer installation. July 19, 2017 Grading Green Tree July 26, 2017 Grading WIS 22/156 intersection. July 26, 2017 Installing base course at WIS 22/156 intersection. July 26, 2017 WIS 22/156 intersection August 2, 2017 Paving Green Tree August 2, 2017 Paving Green Tree August 9, 2017 Paving Green Tree August 16, 2017 Paving WIS 22 August 16, 2017 August 22, 2017 WIS 22 between 18th Street and North Park August 24, 2017 Trimming WIS 22 between 13th Street and 14th Street August 29, 2017 Paving WIS 22 August 29, 2017 Paving WIS 22 August 29, 2017 Paving WIS 22 August 30, 2017 Paving between 18th Street and WIS 156. August 30, 2017 Paving between 18th Street and WIS 156. August 30, 2017 Paving between 18th Street and WIS 156. September 6, 2017 Paving southbound WIS 22. September 7, 2017 Paving at Harriet Street. September 14, 2017 Installing curb and gutter along northbound WIS 22. September 20, 2017 Crews paving the WIS 22/19th Street intersection. September 20, 2017 Crews paving the WIS 22/20th Street intersection. September 27, 2017 Sidewalk preparation September 27, 2017 Sidewalk preparation September 28, 2017 Sidewalk preparation September 28, 2017 Sidewalk preparation September 28, 2017 Sidewalk preparation October 4, 2017 Sidewalk installation October 4, 2017 Sidewalk installation October 11, 2017 Topsoil installation October 25, 2017 Looking good, Clintonville! Almost ready to open :-) October 25, 2017 Almost finished!