WIS 22 (Main St.)

Clintonville, Waupaca County

Photo gallery

 

October 22, 2015

October 22, 2015

WIS 22/12th Street intersection
October 22, 2015

October 22, 2015

Railing on bridge over Pigeon River
October 7, 2015

October 7, 2015

Curb and gutter installation on WIS 22 and 11th Street
September 30, 2015

September 30, 2015

Finishing bridge deck
September 30, 2015

September 30, 2015

Pouring bridge deck
September 30, 2015

September 30, 2015

Tying deck steel for bridge
September 23, 2015

September 23, 2015

Falsework for bridge over the Pigeon River
September 23, 2015

September 23, 2015

Retaining wall construction
September 17, 2015

September 17, 2015

Grading for concrete pavement at WIS 22/13th Street intersection
September 9, 2015

September 9, 2015

Paving on WIS 22
September 9, 2015

September 9, 2015

Paving on WIS 22
September 2, 2015

September 2, 2015

Trimming operations to prepare for concrete paving
September 2, 2015

September 2, 2015

Finishing curb and gutter
September 2, 2015

September 2, 2015

Pre-boring in north abutment
August 26, 2015

August 26, 2015

Bridge north abutment excavation
August 26, 2015

August 26, 2015

Gravel placement
August 26, 2015

August 26, 2015

Subgrade improvements
August 5, 2015

August 5, 2015

Storm sewer installation
August 5, 2015

August 5, 2015

Piling installation on bridge
July 31, 2015

July 31, 2015

Storm sewer installation
July 15, 2015

July 15, 2015

Removing an existing girder
July 9, 2015

July 9, 2015

Removing one of the bridge’s box girders
July 8, 2015

July 8, 2015

Bridge removal on WIS 22
July 1, 2015

July 1, 2015

Installation of water main on WIS 22 between 11th Street and 12th Street
July 1, 2015

July 1, 2015

Pavement Removal in the intersection of WIS 22 and 12th Street
July 1, 2015

July 1, 2015

Sanitary Sewer installation on WIS 22 between 11th Street and 12th Street
July 1, 2015

July 1, 2015

Installation of water main on WIS 22 at the intersection of 12th Street
June 24, 2015

June 24, 2015

Traffic on the detour route
June 10, 2015

June 10, 2015

Detour route improvements
June 10, 2015

June 10, 2015

Detour route improvements
June 10, 2015

June 10, 2015

Detour route improvements
October 22, 2015

October 22, 2015

Rolling asphalt at 11th Street