WIS 21 (Sheridan Street to Adams County Line)

Necedah, Juneau County

Project Overview

The Wisconsin Department of Transportation (WisDOT) will improve this 3.2-mile section of WIS 21 from WIS 80 to the Adams County Line.

Improvements include:

  • Replace the existing concrete pavement from Sheridan Street to the railroad crossing
  • Replace concrete pavement, curb ramps and traffic signals at WIS 80 intersection
  • Remove the top 3 inches of asphalt pavement and replace it with 4 inches of asphalt pavement from railroad crossing to Wisconsin River Bridge with the exception of County G intersection
  • Modernize County G intersection to a roundabout
  • Replace guardrail
  • Install pavement marking
  • Install centerline and shoulder rumble strips in rural areas