WIS 175

Milwaukee Street

Project Overview

This project will reconstruct .73 miles of WIS 175 (Milwaukee Street) between Church and Maple Street in the Village of Lomira. The project will improve the deteriorating pavement conditions and accommodate the needs of pedestrians and bicyclists. Work consists of  pavement removal, grading, storm water detention pond, storm sewer, sanitary sewer, water main, base aggregate, curb and gutter, concrete sidewalk, asphalt pavement, permanent signing, and pavement markings.