Project Overview
Construction includes:
- Removing a portion of the existing pavement, pulverizing the subbase and injecting it with an asphaltic emulsion and then overlaying the roadway with 3.5 inches of new asphalt pavement
- Replacing the deck on the Bad River Bridge
- Replacing some culverts and placing new ones
- Repairing an eroding ditch
- Removing a railroad crossing
- The railroad will replace the crossing at a later date.
- Cleaning culverts and ditches where needed
- Adding centerline rumble strips
- Adjusting and/or replacing guardrail
- Enhancing gravel shoulders
- Placing pavement markings