WIS 169, WIS 13 to the Iron County Line

Ashland County

Project Overview

Construction includes:

  • Removing a portion of the existing pavement, pulverizing the subbase and injecting it with an asphaltic emulsion and then overlaying the roadway with 3.5 inches of new asphalt pavement
  • Replacing the deck on the Bad River Bridge
  • Replacing some culverts and placing new ones
  • Repairing an eroding ditch
  • Removing a railroad crossing
    • The railroad will replace the crossing at a later date.
  • Cleaning culverts and ditches where needed
  • Adding centerline rumble strips
  • Adjusting and/or replacing guardrail
  • Enhancing gravel shoulders
  • Placing pavement markings