WIS 153, Rangeline Road to Water Street

Mosinee, Marathon County

Project Overview

Crews will replace the roadway pavement between Rangeline Road and Novak Street and resurface the pavement between Novak Street and Water Street.

Improvements also include replacing deteriorated curb and gutter and storm sewer structures, replacing curb ramps that do not meet current Americans with Disabilities Act (ADA) standards, replacing the traffic signal equipment and loops, and adding a right-turn signal for the right turn from WIS 153 (4th Street) onto eastbound WIS 153 (Main Street) at the 4th Street and Main Street intersection.

New sidewalk will also be constructed between Rangeline Road and Novak Street, on the north side of WIS 153, and city water services, on the south and east sides of WIS 153, between Rangeline Road and Fremont Street will be replaced.

Planned improvements on detour route:

  • Resurface the pavement on Rangeline Road between
    WIS 153 and County B/Main Street
  • Intersection improvements at the intersections of Rangeline Road with
    WIS 153 and County B/Main Street with Rangeline Road

6370-01-73

  • City of Mosinee
  • Pine Street to Wisconsin River Bridge
  • WIS 153
  • Marathon County

6370-01-75

  • City of Mosinee
  • Rangeline Road to Pine Street
  • WIS 153
  • Marathon County

6370-01-76

  • City of Mosinee
  • Rangeline Road to Pine Street
  • WIS 153
  • Marathon County