Project Overview
Construction includes:
- Replacing the expansion joints at each end of the bridge deck
 - Removing and replacing the south edge of deck
 - Installing stainless steel protective flashing and corrosion protection on the south edge of deck
 - Replacing the concrete pavement approach slabs
 - Paving approximately 25 feet of asphalt pavement
 - Repairing the concrete surface at the abutments
 - Replacing the south railing
 - Salvaging and cleaning existing rebar
 - Cleaning and painting the steel girder abutment bearings and the south exterior girder and painting the remaining girders at spot locations
 - Sealing the bridge deck
 - Replacing pavement markings