Schedule and Traffic Impacts
Page last updated: May 30, 2025
Schedule: May 30 to Aug. 4, 2025
Anticipated work scheduled: Crews will:
- Install traffic control and erosion control
- Begin sawcutting
Traffic impacts (the next 10 days): Traffic will be reduced to a single lane closure with flaggers when the contractor is on site for erosion control and sawcutting operations.
Traffic will be reduced to single-lane with flaggers and shifted during culvert removal and paving operations. Traffic will be traveling on gravel surface for a short duration.