Project Overview
Construction includes:
- Replacing the existing sets of culvert structures at each site
- The northern culvert will be replaced by three elliptical concrete pipes, and the southern culvert will be replaced with a twin-cell concrete box culvert.
- Grading each site
- Placing new pavement on WIS 13 at the replacement sites