Project Overview
This project will address the failing slope on the east side of WIS 136 along the Baraboo River from WIS 154 to north of Oak Street and rebuild the full pavement structure in the area of the slope failure and repave the remaining roadway in the project area.
Additional improvements include:
- Sheet pile will be driven 8ft from the current edge of pavement on the east side of the road
- Guard rail will be installed for the entire length of the sheet pile