Schedule
Construction starts: March 31, 2025
Anticipated completion: mid-November 2025
Traffic impacts
WIS 131 will be closed to through traffic and detoured utilizing WIS 60 and US 61.
Bridge Closures
- The bridge between Steuben and County E is open for emergency services as grading continues at each side of the new bridge.
- The bridge just north of County E is open for local traffic only with a reduced lane width.
- The bridge located 1500 feet south of County W near Barnum is closed to all traffic as work continues on the new structure.
- The bridge located 0.75 miles north of County E is closed to all traffic as demolition work is currently occurring on the existing structure.
Daytime closure for storm sewer installation
- Storm sewer installation work continues in the Village of Steuben, a minimum of one travel lane will be provided during non-work hours.