Schedule
Construction starts: March 31, 2025
Anticipated completion: mid-November 2025
Traffic impacts
WIS 131 will be closed to through traffic and detoured utilizing WIS 60 and US 61.
Bridge Closures:
- The bridge between Steuben and CTH E is open for emergency services as grading continues at this structure
- The bridge just north of CTH E is open for local traffic only with a reduced lane width
- The bridge located 1500 feet south of CTH W near Barnum is open for local traffic with a reduced lane width
- The bridge at Sunny Ridge Road is closed, new steel piling is scheduled to be installed later this week
- The bridge located 0.75 miles north of CTH E is closed to all traffic as the new concrete deck is curing and parapet work is scheduled to begin
Daytime closure for storm sewer installation:
- Storm sewer work has started in Soldiers Grove, a minimum of one travel lane will be provided during non-work hours
Other activities:
- The existing pavement has been milled and relayed from Soldiers Grove to the north side Gays Mills, as well as from the south side of Gays Mills to Sunny Ridge Road
- The first lift of asphalt pavement has been installed from Gays Mills to Soldiers Grove
- All grading work in Steuben is completed; new curb & gutter as well as sidewalk was completed last week
- New curb & gutter was installed from Gays Mills to Sunny Ridge Road