Project Overview
Construction includes:
- Recycling 3.75 inches of the existing asphaltic surface and paving 2.75 inches over the recycled pavement in the rural section of the project
- Milling approximately 3.25 inches of the existing asphaltic surface and paving the roadway with 3.25 inches of hot-mix asphalt in the urban section
- Placing centerline rumble strips
- Overlaying the deck on the bridge over Tiffany Creek in Glenwood City
- Updating guardrail throughout the project corridor
- Cleaning or replacing culvert pipes
- Updating sidewalk curb ramps in Glenwood City
- Installing new pavement markings