Schedule and Traffic Impacts
Page last updated: Sept. 5, 2025
Schedule: July 14 to September 2025
Anticipated work scheduled: Crews will:
- Install erosion control and landscaping throughout the projects.
- Grade and place base course between Firekeeper Road and Indian Drive.
- Construct the new pedestrian box culvert.
- Install curb in the reconstructed area near Laona.
- Install storm sewer.
- Begin milling and paving on the west end of the project headed in an easterly direction.
Traffic impacts (the next 10 days): WIS 122 will be detoured using US 2, US 51 and WIS 77.