WIS 122, WIS 77 to South County B

Iron County

Schedule and Traffic Impacts

Page last updated: Sept. 5, 2025

Schedule: July 14 to September 2025

Anticipated work scheduled: Crews will:

  • Install erosion control and landscaping throughout the projects.
  • Grade and place base course between Firekeeper Road and Indian Drive.
  • Construct the new pedestrian box culvert.
  • Install curb in the reconstructed area near Laona.
  • Install storm sewer.
  • Begin milling and paving on the west end of the project headed in an easterly direction.

Traffic impacts (the next 10 days):  WIS 122 will be detoured using US 2, US 51 and WIS 77.