Project Overview
The Wisconsin Department of Transportation (WisDOT) improvement project along a 0.34-mile section of WIS 106 in Palmyra by resurfacing the existing asphalt pavement. Treatment is needed to extend the pavement service life.
Additional improvements include:
- Upgrading curb ramps as needed to meet ADA requirements