Project Overview
Crews will:
- Remove 2-inches of the existing asphalt pavement and replacing with 2-inches of new asphalt pavement the entire length of the project.
- Widen the asphalt portion of the shoulder from 3 feet to 5 feet (and add rumble strips) from County Y to the east project limits to improve biking conditions.
- Replace the existing thermoplastic pavement marking at snowmobile crossing located 3 miles east of McCord.
- Road and adding thermoplastic pavement markings at four additional snowmobile crossings.
- Replace the existing guardrails connected to the roadway bridge over the Tomahawk River.
- Replace the curb and gutter at the County U intersection.
- Replace the existing railroad crossing, the roadway approaches, drainage culverts and vision triangle clearing for federal railroad safety requirements at the Fox Valley and Lake Superior railroad crossing.