US 8, WIS 55 to Otter Creek Road

 Forest County

Project Overview

The project will include:

  • Milling the existing pavement and resurfacing it with new asphalt areas along US 8 within the project limits except for the section between Fire Keeper and Bug Lake roads.
  • Removing the climbing lane from Grandview Avenue to High View Drive and improving storm water drainage in the area.
  • Reconfiguring the lanes between Wildwood and Grandview avenues.
  • Making profile and horizontal adjustments on US 8 between Fire Keeper and Bug Lake roads.
  • Grading slopes and removing cable guard throughout the corridor at existing cable guard locations.
  • Replacing several culvert pipes.