Project Overview
Construction includes:
- Replacing the bridge deck
- Repairing spalling on bridge abutments
- Repairing exposed rebar on girders
- Replacing concrete pavement approach slabs
- Replacing up to 50 feet of paved approach on both sides of the bridge
- Reinstalling guardrail
- Replacing pavement markings