US 63, Mill Pond

Bayfield County

Project Overview

Construction in 2026 includes:

  • Drawing down Mill Pond
  • Realigning the Long Lake branch
  • Building a bypass to carry a single lane of traffic during 2027 construction

Construction in 2027 includes:

  • Removing the box culvert/dam structure
  • Constructing a bridge to replace the box culvert
  • Removing the temporary bypass
  • Placing new pavement markings