US 53 (northbound), Chippewa County line to US 8

 Barron County

Project Overview

This project includes:

  • Removing a portion of the existing pavement and placing new asphalt pavement from County I in the town of Chetek to US 8 in Cameron.
  • Completing spot repairs on select structures.
  • Placing a concrete overlay on each bridge deck in the project location.
  • Replacing the concrete deck on the structure at County A and overlaying the decks with concrete on bridges at the Chetek River and County I.
  • Completing spot improvements at Rest Area 34 southeast of Chetek, and overlaying all concrete parking areas with new asphalt pavement.
  • Repairing culverts and ditches.
  • Replacing culvert apron end walls, guardrail, pavement markings, and signage.