Project Overview
Construction has included:
- Removing the existing pavement and a portion of the existing base course.
- Placing a new base aggregate layer for drainage and new concrete pavement.
- Replacing storm sewer, culverts, curb and gutter.
- Reconstructing the approaches to US 53 from existing intersections.
- Replacing shoulder rumble strips.
Construction in 2024 includes:
- Restoring areas disturbed during construction.
- Placing permanent pavement markings.