Project Overview
Crews will replace the deck of the Turtle River Bridge near Mercer, relocate the driveway in the southwest corner of the bridge, replace the guardrail in all four quadrants, replace the steel railing on the bridge with concrete parapet and replace the concrete approach slabs.