Project Overview
US 51 from Spring Road to 5th Street will have the following improvements:
- Reconstructing the existing 2-lane urban section to include a travel lane and bicycle lane in each direction.
- Reconstructing sidewalk, curb ramps, and crosswalks to meet Americans with Disabilities Act (ADA) standards.
- Installing a new pedestrian refuge island at Ashberry Lane.
- Reconstructing the 5th Street retaining wall.
- Upgrading signal equipment and providing a protected left turning phase at the County N intersection.
- Installing continuous street lighting between 5th Street and County N.