Construction includes:
- Painting spot locations of the existing steel arch structure of the center span
- Making concrete surface repairs at spot locations of the two piers that support the center steel arch structure
- Replacing street lighting on the Minnesota half of the structure, including on the Minnesota ramps
- Replacing street lighting on the Wisconsin approach
- Removing and replacing the three rubber strip seals of the center tied arch
- Applying a concrete sealer to the entire deck, including the Minnesota ramps
- Placing new pavement markings on the entire bridge, Minnesota ramps and Wisconsin approach