Overview
The project is designed to improve safety at the US 151 and County DE intersection by reconstructing the current intersection to a restricted crossing U-turn (RCUT) with offset right-tun lanes at the intersection.
- Construction schedule: July 7 - September 15, 2025
The project is designed to improve safety at the US 151 and County DE intersection by reconstructing the current intersection to a restricted crossing U-turn (RCUT) with offset right-tun lanes at the intersection.
- Construction schedule: July 7 - September 15, 2025